FPY / RTY Yield Calculator

Calculate First Pass Yield per step and Rolled Throughput Yield across all process steps. First Pass Yield (FPY) measures the percentage of units that pass…

First Pass Yield (FPY) measures the percentage of units that pass through each process step without rework. Rolled Throughput Yield (RTY) multiplies all FPY values to show the true end-to-end yield.

What are FPY and RTY and why are they important?

First Pass Yield (FPY) measures the percentage of units that pass through a process step correctly the first time, without any rework, repair, or scrap. It is a more honest quality metric than final yield because final yield hides the cost of rework.

Rolled Throughput Yield (RTY) is the product of all individual FPY values across a multi-step process. It reveals the true probability that a unit will flow through the entire process without any defect at any step. RTY is always less than or equal to the lowest individual FPY.

For example, five process steps each with 95% FPY give an RTY of 0.95^5 = 77.4%. This means nearly 1 in 4 units requires rework or generates scrap somewhere in the process — a hidden factory that consumes resources without adding value.

Formula: FPY = Good Units / Total Units (per step) RTY = FPY₁ × FPY₂ × ... × FPYₙ Average FPY = (FPY₁ + FPY₂ + ... + FPYₙ) / n

Example Calculation

A 3-step process: Step 1 produces 95 good out of 100 (FPY=95%), Step 2 produces 90 good out of 95 (FPY=94.7%), Step 3 produces 88 good out of 90 (FPY=97.8%). RTY = 0.95 × 0.947 × 0.978 = 88.0%. Expected output from 100 inputs: 88 units.

When to Use This Calculator

Common Mistakes to Avoid

How to Interpret Results

Related Standards & References

Frequently Asked Questions

Why is RTY better than final yield for measuring quality?

Final yield only counts units that ultimately pass, regardless of how many were reworked. A process could show 98% final yield while RTY is only 75%, meaning 25% of units needed rework. RTY exposes the 'hidden factory' — the rework loops, retests, and repairs that consume time and money without adding customer value.

How do I improve RTY?

Focus on the step with the lowest FPY first, as it has the greatest impact on RTY. Use root cause analysis (5 Why, fishbone diagram) to identify why defects occur at that step. Common improvements include mistake-proofing (poka-yoke), better incoming material control, operator training, and tighter process parameter control.